ECM Plan & Design
Site-specific plans and drawings for silt control, sediment containment, wash water and runoff, endorsed by the QECP.
About ECM designQP Advisory Pte Ltd +65 9800 4385 WhatsApp pe@qp.sg
Practical, QECP-led support for construction projects that need Earth Control Measures — from the first plan through PUB registration, construction and final removal.
Site-specific plans and drawings for silt control, sediment containment, wash water and runoff, endorsed by the QECP.
About ECM designSubmission documents, comment responses, and re-submission when the approved arrangement changes on site.
About PUB submissionInspection against the approved plan, rectification advice and records, and QECP verification before ECM removal.
See the inspection checklistDevelopers, owners, architects, QPs, builders and civil contractors who want a responsive, Singapore-based QECP.
Early planning for earthworks, drainage diversion and temporary runoff control, so ECM is built into the programme rather than added late.
Proportionate ECM for additions and alterations on tight landed-housing sites, where space for treatment is limited.
Quick turnaround on PUB comments, changes in site layout or phasing, and rectification after an inspection finding.