ECM Report Builder
ECM Design Report and Calculations, ready for your QECP review
Prepare an Earth Control Measures design report to PUB Code of Practice on Surface Water Drainage, Section 6.3 — design storm, runoff, MUSLE sediment yield, cut-off drain, holding capacity and silty-water treatment checks — and download it as PDF or Word.
What the report covers
- Design storm from COP Appendix 4 IDF curves (≥ 5-year return period)
- Rational runoff volume and peak flow per catchment
- Soil erodibility K, RUSLE LS, cover factor and MUSLE sediment yield
- TSS check against the 50 mg/L discharge limit
- Cut-off drain capacity (Manning), holding capacity and 10-hour treatment check
- Declarations, signature blocks and references
Passes
Pay by PayNow. Your pass starts when the payment is confirmed (normally within one working day) and runs for the full period from then; buying again before it ends extends it. Prices in Singapore dollars; GST is not charged. Nothing renews automatically.
Sign in
We email you a one-time sign-in link — no password. Accounts with @pec.sg or @qp.sg email addresses have unlimited access.
Design aid for the QECP. The QECP remains responsible for the ECM design, its assumptions and implementation. Verify against the current PUB COP on Surface Water Drainage and the SCAL–PUB ECM Guidebook before submission. Reports are prepared to PUB COP Section 6.3; they are not an approval by PUB. Project inputs stay in your browser and are not uploaded.