Submission package
ECM drawings, calculations and supporting site information, organised for submission — see ECM design.
QP Advisory Pte Ltd +65 9800 4385 WhatsApp pe@qp.sg
Complete, coordinated documents the first time — and quick, clear answers when PUB comes back with comments. Earth Control Measures are registered with PUB under the Sewerage, Drainage and Coastal Protection Act 1999.
Doing the design calculations in-house? The ECM Report Builder (day, monthly and year passes) prepares runoff, MUSLE sediment yield, cut-off drain, holding and treatment checks to PUB COP Section 6.3.
ECM drawings, calculations and supporting site information, organised for submission — see ECM design.
Review of PUB or consultant comments and revised documents to close them out without unnecessary rounds.
Alignment with civil, architectural and construction teams, and re-submission when the site arrangement changes.
Typically a site plan, QECP-endorsed ECM drawings, design calculations, and any earlier correspondence or comments from PUB.
Each comment is checked against the submitted documents and answered with revised drawings or clarification notes, coordinated with the project QP and contractor.
No. The ECM must be installed in accordance with the QECP-endorsed, PUB-approved plan before work commences. See ECM design for how the plan is prepared.