ECM Design Singapore

Earth Control Measures design for construction sites

An ECM plan that suits the site, not a template: sized to your catchment, levels, discharge points and construction sequence, endorsed by a QECP and ready for PUB submission.

Doing the design calculations in-house? The ECM Report Builder (day, monthly and year passes) prepares runoff, MUSLE sediment yield, cut-off drain, holding and treatment checks to PUB COP Section 6.3.

What the design package covers

Each element is chosen so the measures can actually be built, maintained and inspected on your site.

1

Runoff strategy

Review of site layout, levels, catchments, discharge points and sequencing constraints.

2

Sediment control and treatment

Silt traps, sediment basins, perimeter cut-off drains, wash-down bays and treatment, with supporting calculations.

3

Maintenance and inspection notes

Practical notes for the contractor to maintain the measures — see the ECM inspection checklist.

ECM design FAQ

Q

How long does ECM design take?

Most ECM design packages are turned around within 3–7 days, depending on site complexity and the information available.

Q

What information is needed to start?

A site plan, existing and proposed levels, discharge points, and the construction sequence or programme.

Q

Does the ECM plan need QECP endorsement?

Yes. PUB requires the ECM plan to be endorsed by a Qualified Erosion Control Professional (QECP) and approved by PUB before work begins. See about our QECP.